One floor down, one wall up

11760059_10152362255444979_6659070809054616950_n

The subfloor is down! The back wall is framed with 2×6 studs, the rest of the walls will be 2×4

It should take 2 more days of work to finish the framing. Since we’re only able to work one day a week this will take a while. At this point, I’m really relying on help from Seth since I have no idea what I’m doing! I’m hoping I will be able to do more work on my own in the future so the project will move a little faster.

I’m so grateful to my friends who have helped me the last few days by building, babysitting and driving all over the place to pick up windows and doors! I feel so lucky and loved.

11221996_10152362255224979_576907685052874531_n      11693961_10152362255439979_3470188050942565968_n

11755147_10152362255239979_7766072928869755827_n

I’ve also started shopping for a “normal” house so I have a place to park Little Lou when we’re done building. I kinda fell in love with a house that needs a lot of work – what the heck is wrong with me?! As if I didn’t have enough going on! It’s all a little overwhelming to say the least.

One thought on “One floor down, one wall up

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s